Expected to open traffic lanes on Rama 2 Road in 7 days.

Follow the progress of the collapsed steel beams of the Rama 2 bridge this morning (16 Mar 2015). The engineering team is demolishing the collapsed elevated bridge structure. It is expected to be completed within the timeframe and traffic lanes will be open within 7 days. สล็อตเว็บตรง

Leave a Reply

Your email address will not be published. Required fields are marked *